FeasibilityNorth-Western Province, Zambia

West Lunga Hydropower Project

A four-station, run-of-river scheme on the West Lunga River delivering 80MW across four phased 20MW stations, with FID targeted for Q4 2027.

Capacity
80MW
Annual output (P50)
~500 GWh
FID target
Q4 2027

Project overview

About the project

West Lunga is a four-station, run-of-river scheme on the West Lunga River in Zambia’s North-Western Province, with a total installed capacity of 80MW across four phased 20MW generating stations designed to produce 500 GWh annually.

All technical and environmental feasibility studies are complete, government development rights have been secured, and the project is positioned to advance to financial close following final Technical Bankable Feasibility Study (BFS) processes.

Phase 1 (20MW) is underpinned by a 20-year take-or-pay PPA under active negotiation with a large, listed mining offtaker, with ZESCO wheeling arrangements also underway.

Ngoli Energy is entering exclusivity for an 85% stake in the project, with pre-emption rights over subsequent phases; development costs are expected to be reimbursed at financial close.

Project highlights

Why this project

01

Drought-resilient hydrology

The North-Western Province catchment delivers consistent, year-round flow rates unaffected by drought cycles.

02

Advanced development status

Full suite of technical and environmental feasibility studies complete; government development rights secured.

03

Firm, dispatchable output

Run-of-river design with a small catchment dam ensures steady flow and schedulable baseload generation.

04

Bankable offtake

20-year take-or-pay PPA under active negotiation with a large, listed mining company; ZESCO wheeling discussions underway; targeting 11.0c/kWh.

Learn more about West Lunga